Experience –
Current
Volunteer Spaces Gallery
June 2009 to PresentRebuilding Together March 1992 to Present
Veterans Service
Representative Veterans Benefits Administration.
August 2012 to July 2014
Processed Claims
The Interim
Cleveland State University - Bachelors of
Arts Organizational Leadership December 2012 Magna Cum Laude
Experience -
Construction Project Management
Contract Traveling Project
Superintendent Rectenwald Brothers Construction Inc.
July 2010 to November 2011
Retail Build Outs & Rebranding Florida, Virginia,
Minnesota, Pennsylvania and Ohio.
Project Superintendent Blaze Building
Corp. April 2008 to October 2008
Jefferson (Ohio) Junior & Senior High
School LEED
Silver specifications. Two story masonry structures with performing arts
auditorium, basketball courts, $32MM, 162,000 sq. ft.
Contract Project Superintendent
Gioffre
Companies Inc. March to November 2007
Lowe’s Rocky River, OH $6.8MM
126,000 sq. ft. SuperWide store prototype. Project straddled two
jurisdictions. Ground up construction on former mall site.
Substantial regulatory obstacles and challenges from surrounding residents.
Contract Traveling Project
Superintendent FH Martin Constructors
October 2006 to February 2007
Supported various Kroger remodels, an
upscale grocer in Grosse Pointe, Michigan and the Kyser Elementary School in
Toledo.
Project Superintendent The Darden Company
January 2005 to October 2006
Target: Bainbridge, OH $4.4MM
130,000 sq. ft. “P Store”. Designed extensive winter conditions
solutions overcoming a (4) week starting delay and finishing 3 weeks ahead
of schedule. Coordinated wetlands issues and site utility
complications. Project foot printed on three counties.
Cosmo Development: Mayfield
Heights, OH EastGate Shopping Center - Renovated MicroCenter exterior
and North Strip Center. Controlled unseen extra costs to less than 8% -
down over 60% on the previous phase.
Traveling Project Superintendent Gioffre Companies
Inc. October 1999 to December 2004
Target: Fast Track Open Store
Remodel/Expansions – Michigan (5 projects) – Brighton; Commerce Township;
Port Huron; Madison Heights and Flint. Ohio – Toledo (2 projects) $2.8
-$4.3 MM.
THF Realty: Chippewa,
PA – 30,000 sq. ft. strip center. Sommerset, PA - 30,000 sq. ft. strip
center (substantial rock excavation). Monaca, PA - Strip center
facelift.
Lowe’s: Mentor, OH - $3.9MM 120,000
sq. ft. Recovered from substantial site and weather delays.
Lowe’s: Massillon, OH – $4.8MM
115,000 sq. ft. completed (2) weeks ahead of schedule and under budget.
Project Superintendent Cleveland
Construction Inc. October 1998 to October 1999
Wal-Mart: Bentonville, AR $7.8MM
1,200,000 sq. ft. Distribution Center. General prime contractor (one of
seven prime contractors). Project on 280 acres with multiple buildings
including; semi-truck service facilities, fire suppression pump facilities
and security structures. Responsible for precast concrete panel
installation, interior concrete, interiors and interior dust control (to
prevent buildup of explosive levels of dust).
Wal-Mart: Ankeny, IA $8.9MM 206,000
sq. ft. SuperCenter. 25 acre project with substantial site (exporting
farming grade topsoil and importing 18” of manufactured sand on the project
foot print) and utility work, wetlands mitigation and public right of way
improvements. Designed concrete and masonry winter condition solutions.
Project Manager/Estimator
JJO
Construction Inc. June 1998 to October 1998
Rite Aid Drug Marts: Willoughby,
OH & Cleveland Heights, OH - $1.1 & 1.8MM 11,000 sq. ft.
projects. Completed ahead of schedule and under budget.
CVS Drug Mart: Cleveland,
OH $1.4MM 14,000 sq. ft. Existing structure demolition with EPA asbestos
abatement and underground removal of fuel tanks and hydraulic lifts.
Summit County Low Income Housing: Stow, OH $2.4MM
(8) two story, multi-unit buildings.
Assistant
Superintend/Superintendent Panzica
Construction Inc. September 1994 to May 1998
Westlake Recreation and Community Center: Westlake,
OH $14MM project with (5) indoor swimming/diving pools; basketball
courts, elevated running track, fitness center, galleries, library and
offices. Tennis courts, baseball diamonds and soccer fields on 88 acre
site. Designed and oversaw corrective procedures to major structural
steel acoustical steel decking deficiencies.
Marriott Hotel: Westlake,
OH $6.0MM three story upscale hotel. Completed ahead of schedule for
full occupancy grand opening for the Major League Baseball Playoff games in
Cleveland.
Larchmere Construction: Cleveland,
OH $3.6MM. Over (60) residential rehabs. Previewed properties for
acquisition; estimated rehab costs and developed work scopes, negotiated
subcontracts; oversaw subcontractors and self-performed work and assisted in
the sale of properties.
Military and Other
Development
U.S. Army - Honorable Discharge
Private Pilot’s License
Amateur Radio Technician License KD8WRF
OSHA 10 - Safe to Work; 30 hour OSHA Safety
Course for Supervisors; CPR certification.